Accessibility
- Mark keyboard navigation
-
Choose font size
-
Change contrast
- Reset accessibility
Testimonials
Medical Device Case Studies
Customer: Medical
Customer Goal: Outsourcing the existing in-house medical device manufacturing processes.
Project Challenges:
-
Learning the existing in-house manufacturing processes
-
Implementing the acquired knowledge into Sherman's manufacturing methodology
-
Managing medical device integrated turnkey project
-
Customizing and managing vast amount of model changes through features and spare part replacements in short time and while preserving high quality standards
-
Consistent BOM cost reduction throughout the project
-
Construction of new production lines necessary for the new product and moving the production from the client's factory to Sherman
-
Management of quality control for critical steps in the production process
-
Development of test units and devices for the optimization of the production process
Customer: Medical
Customer Goal: Transform a concept to a product while maintaining strict and tight time frame
Project Challenges:
-
Collaborate successfully with external third party - planner
-
Management of integrated product manufacturing life cycle
-
Overcome engineering scheme data insufficiency during the designing phase
-
Quick production of the developed product while maintaining high quality standards
Communication Industry Case Study
Customer: Communication
Customer Goal: Manufacture under tight time frame several products models for electronic integrated solutions exhibition
Project Challenges:
-
Work under rigid time constrains and meet deadlines
-
Manufacture complex multi-component (mechanic, plastic and electronic aspects)
-
products via high quality electromechanical assembly
-
Production line planning, development, control and measurement
-
Establishing full supply chain and manufacturing infrastructure
Banners
Skip Banners